System designer

Off-grid solar system designer

List what you want to power. The designer sizes the panels and how to wire them, the charge controller, the battery bank, the inverter and the main cables, and gives you a parts list.

Educational design aid, not an electrical design

1. What do you want to power?

Use the watts on each appliance's label. The quick-add buttons put in typical example values: replace them with your own.

ApplianceWattsQtyHours/dayStart-up WDC

"Start-up W": motors (fridges, pumps, air conditioners) draw several times their running watts for a moment when they start. Use the label or manual value; leave 0 if unknown for non-motor loads. Tick DC for loads wired straight to the battery (no inverter).

2. Site and battery

Fills the worst-month sunshine from PVGIS.

h/day
days
Cloudy days the battery covers alone.
%
°C
Coldest morning on record. Panel voltage rises in the cold.
Losses and cable runs
Heat, dirt, wiring, controller and battery losses. 0.75 is our assumption.
%
m
One-way length.
m
One-way length.
%

3. Panel and controller datasheets

The starting values are an illustrative example, not a specific product. Pick a product from our catalog or copy the real numbers from your panel's datasheet (STC column) and your charge controller's manual.

W
V
V
A
A
%/°C
V
From the MPPT controller manual, e.g. "150 V" in its name.

How the designer works

It adds up the energy your appliances use each day, allows for inverter losses, and sizes the panels to refill the battery in your darkest month. It then finds how many panels can go in series without the cold-morning voltage exceeding the controller's limit, while still being high enough above the battery voltage to charge. The battery covers your days of autonomy within the usable depth of discharge, the inverter covers everything running at once plus headroom and the biggest start-up surge, and cables are sized for your voltage-drop target. All formulas are on the methodology page.

It does not size fuses, breakers or earthing, and it does not check cable current ratings for your installation method. Have a qualified electrician check the design and follow your local wiring rules.